ClickCease

Menu

Close

    Nevada Vanadium Mining Corp. is a Canadian company wholly owned by Silver Elephant Mining Corp (TSX: ELEF, OTC: SILEF). The Company is permitting Gibellini vanadium project in Nevada and aims to be the first primary vanadium producer in the US by 2023.

    GIBELLINI (VANADIUM)

    Related Documents

    pdf Gibellini Presentation 2020 (pdf)
    pdf November 2017 Gibellini Technical Report (pdf)
    pdf June 2018 Gibellini Preliminary Economic Assessment (pdf)

    Please visit www.nevadavanadium.com for details


    Asia Mining Inc. is a Canadian company wholly owned by Silver Elephant Mining Corp (TSX: ELEF, OTC: SILEF). The Company has one operating thermal coal mine and one other thermal coal deposit in Mongolia.

    ULAAN OVOO (COAL)

    Related Documents

    pdf June, 2020 Company Presentation
    pdf Dec 2010, 43-101 Prefeasibility Study Update (File size: 5.0mb)
    pdf May 2009, 43-101 Prefeasibility Study (File size: 9.0mb)

    Please visit www.asiamininginc.com for details


    TITAN (TITANIUM VANADIUM)

    Overview

    The Project owned by Silver Elephant and is located at Flett and Angus Townships, 120 kilometres northeast of Sudbury, Ontario. The Property consists of 262 contiguous hectares comprising 17 patented claims, with access to water, roads and electrical power.

    The technical report was prepared by Mine Development Associates and is dated October 23, 2017 (the “Technical Report”). The Technical Report (available under the Company’s SEDAR profile at www.sedar.com) was prepared in compliance with National Instrument 43-101, Standards of Disclosure for Mineral Projects (“NI 43-101”) and reports an inferred resource for the Property as follows:

    Resource Category Tonnes (t) Fe2O3 (%) V (%) TiO2 (%)
    Inferred 46.0 million 48.32 0.24 14.88
    V converted to V2O5: 0.24 % V = 0.43% V2O5 The metal content calculated by the
    Company totals 434 million pounds of vanadium pentoxide content and 6,844
    million kgs of titanium dioxide.
    Based on resource estimated at cutoff grade of 40% Fe2O3 inside an optimized pit.
    100% metals recovery is assumed.

    Related Documents

    pdf Titan Project Technical Report October 23, 2017 (pdf)